Very impressed by the professionalism and quality of work done for our pool install. Jakov was excellent. Mark and Ben did a tops job. Really appreciate the extra bit of effort and care taken. Highly recommended!

Switchboard upgrades.
Old fuses, power that keeps tripping, or a board with no room left? We replace it with a modern switchboard that protects every circuit in your home.
Upgrading your board is a good time to check your smoke alarms too.
Switchboards, done properly.
Real Google reviews, word for word. Switchboard upgrades jobs first.
Switchboard upgrade came up mint. Good blokes, fair service and no dramas at all. Happy with the work done
Very happy with our solar battery installation by Powerluxe. The team was professional, reliable and did a fantastic job from start to finish.

Your switchboard is the first line of protection.
Every circuit in the house runs through it. Older boards use ceramic fuses and often have no safety switch on some circuits.
A safety switch (RCD) cuts the power in a fraction of a second when current leaks to earth, the kind of fault that injures people. A modern board protects your power points and lighting, and leaves room for what you add later: solar, a battery, an EV charger, air conditioning.
When to upgrade.
Inspected, installed, tested, explained.
- An inspection of your board, wiring and earthing before we quote
- A new switchboard with safety switches (RCDs) and circuit breakers, every circuit labelled
- Meter box upgrades and supply changes, arranged with Energex
- Moving a board or sub-board to a better spot
- Everything tested and certified when we finish, with a walk-through of the new board
Queensland's safety switch rules
An approved safety switch is required on power point circuits in homes that are sold or rented. A buyer must have one installed within 90 days of taking possession, and landlords need one for rental homes. We can check yours and fit what's needed.
Three steps, no surprises.
Tell us about your home
A photo of your current board helps us come prepared.
We inspect and quote
You get a written quote before anything is booked.
The changeover
The power is off for part of the job, and we'll tell you how long when we book. We test everything and walk you through it.
Do I need a switchboard upgrade to install solar, a battery or an EV charger?
Will my power be off?
How much does a switchboard upgrade cost?
Are safety switches required in Queensland?
Can you move my switchboard?
Related services.
Tell us about your switchboard.
Send a few details, and a photo of the board if you can. We'll come back to you with a quote.
- Written quote before anything is booked
- Electrical Contractor Licence 92262
- Meter box changes arranged with Energex